Mc09 suggested loading guide.
Shingle to metal roof transition detail.
Mc10c low slope ventilated eave detail.
Mc10a down slope eave details.
The best thing is it can reduce your cooling costs even more.
Coated metal roof edge.
To ensure you and your customers have the resources needed to get the job done we ve developed instructional videos that show your customers how to seamlessly integrate pitch transition trim with our high quality metal roof panels.
Repeat this step at the opposite side of the roof frame and.
Roofing multi ply sbs modified bitumen paradiene 20 30 rigid insulation.
Mc10b eave flush wall.
About press copyright contact us creators advertise developers terms privacy policy safety how youtube works test new features press copyright contact us creators.
Conical pipe boot non split.
Concealed wood equipment support.
Roof pitch the metal roofing panels shown in this manual require a mini mum slope of 2 per foot to ensure proper drainage.
The transition point can be a source of problems if not done correctly.
You can save on labor costs by putting metal roofs over shingles.
Conical pipe boot split.
Mc08a roof layout quick reference.
Tar will not fix the problem and will look like and when you do go back to fix the leak the tar will be heck to deal with.
Mc10 raised fascia.
The trim and roofing sheet should be fastened every 12 to 24 inches along the gable edge.
Coated metal joint detail.
String the line along the top of the frame until it meets the shingle roof.
Coated metal wall scupper.
Mark this point of the transition with a marking crayon.
You see it provides an extra layer for covering your home.
Mc10d double lap tile.
Also you don t have to find a place to store the shingles now.
Refer to the rain carrying table in this booklet for the maximum allowable panel length per.
The transition has to be prepared properly with the right underlayments including high temperature ice and water shield when metal is being installed.